Hurghada International Airport terminal building and landside facilities
The Scope of Work Includes the Construction of New Terminal Building with a total Built-Up Area of About 92,600 Sqm. Comprising of Three Main Levels, Ground, Arrival, and Departure, in addition to F&B and VIP Lounges in A Mezzanine Level at the central area for long-waiting passengers.
Completed
Read MoreMarina Way Lagoon Hotel – North Coast
Scope of Works Includes Construction Finishing & Electromechanical Works of a Luxurious Hotel in Marina 5 - North Cost, on a land area 14,120 Sqm. Consists Of (Basement -Ground Floor – 3 Typical Floors-Roof-Upper Roof) With Approximate BUA =16,000 Sqm.
Completed
Read MoreSuez Medical Complex Project
Completed
Read MoreCairo Capital Central Park “Green River” Phases I & II - New Administrative Capital
Cairo Capital Central Park, one of the world’s largest parks, located within the Capital Park corridor of Egypt’s New Administrative Capital. The park will be more than 10 km long, with an area of approximately 1,000 acres.
The Capital Park project is divided from east to west into three planning sectors, each of which contains a park with a different focus.
- History and Gateway Park.
- Health and Sustainability Park.
- Home to Civic Park.
Al Marasem Scope of Work includes Construction of Zone CP-02 B in New Capital Central Park divided into 2 Phases as follows: -
- Phase I – On Land Area 100 Feddan.
- Phase II – On Land Area 116 Feddan.
Completed
Read MoreRenovation of Al-Azhar Mosque, Mashyakha & Islamic Mission city ,Universities & student dorms.
Completed
Read MoreEmaar Sales Centre For Uptown Cairo Project
Construction of Emaar Luxurious Sales Center That Consist of a Two-Floor Building with A Total Built Up Area 25,000 Sqm
Completed
Read MoreConstruction of New Terminal Building at Sharm El Sheikh Airport
Construction of The New Terminal Building at Sharm El Sheikh Airport with a total built up area of about 44,000 Sqm. In Addition to an Electromechanical Plant, Control Building and Associated External Site Works.
Completed
Read MoreHeliopolis Sporting Club Swimming Pools & Changing Rooms
Construction of The Swimming Pools Area (Olympic Diving, Recreation Facilities, Children Pools, Changing Room building), in addition to Two Coffee Shops Along with Site Landscape & Hardscape Works.
Completed
Read MoreNew National Cancer Institute 500 500 Hospital- El Sheikh Zayed City
Construction of a building consisting of 4 basements, ground floor, 5 floors & two roof levels. With a total built up area of approximately 67,000m2.